Loading Legacy Contracts

Languages:  


Date:

This session will teach you how to prepare and load existing contracts into your Ariba solution as well as what additional tasks and approvals are needed when amending them and options for setting up more complex approvals. Topics include:

  • preparing the contract repository template
  • preparing the zip that will be loaded into the system
  • loading contracts into the system
  • trouble shooting errors
5593
loading-legacy-contracts
Loading Legacy Contracts
03/26/2015
contract-management
english
buy
youtube-video
YouTube Video
false